REVIEW & PORTALS

Projects, stacked versions, and locked sign-offs.

Manage deliverables, upload stacked video/image cuts, draw visual frame annotations, export editor markers, and lock final client approvals.

PROJECT STRUCTURE

Organize deliverables or promote a Storage folder

A Project groups deliverables for a campaign or client cut. You can create Projects directly under /workspace, or promote any folder inside Storage Explorer with Make collection so its creative files become tracked deliverables while staying in your Drive or S3/R2 bucket.

  • Each deliverable (Project Item) tracks its own media type (video or image), version stack, and approval status.
  • Pin or favorite collections so active client cuts appear at the top of /dashboard.
  • Archive finished deliverables cleanly without deleting audit history.
VERSION CONTROL

Stack revisions and compare cuts side-by-side

Upload v1, v2, and v3 under the same deliverable instead of spamming clients with new URLs. The review link stays constant while reviewers switch versions cleanly.

  • Upload replacement revisions directly via presigned multipart upload (S3/R2/Managed) or Google Drive revision upload with ETag conflict checks.
  • Use Version Compare inside the review workspace to inspect earlier cuts against the latest revision.
  • Historical timecoded notes remain attached to the exact version where they were left.
FRAME PRECISION

Timecoded comments, visual drawings, and marker exports

HH:MM:SS:FF

Frame-accurate SMPTE notes

Clicking the timeline or pausing pins comments to exact timestamps and frame numbers with threaded replies.

PIN · PEN · RECT · ARROW

Visual frame annotations

Draw freehand paths, arrows, rectangles, or point pins directly on the video canvas so colorists and motion designers see exact adjustments.

TAGS & RESOLUTION

Tags & resolve tracking

Tag notes by department or urgency and mark feedback resolved as edits are completed.

MARKDOWN EXPORT

Export markers for editing

Export timecoded feedback checklists from the comments sidebar straight into your post-production notes.

CLIENT SIGN-OFF

Definitive status transitions and approval locking

Deliverables and projects transition across three clear states: in_review, changes_requested, and approved. When a stakeholder approves a cut (with optional required signature), Tinjau records who approved it, the timestamp, and the approved version ID, locking that deliverable against accidental drift.

Need help from engineering support?

Include your workspace slug, storage provider, or hostname. Never share access keys, refresh tokens, or signed URLs via email.

support@tinjau.app